Risk Analysis for Aluminum Equipment

2007 - Aluminum heat exchangers were inspected by MTS as turn-key contract. An inspection plan was constructed for locations predicted by computational analysis. The plan for inspection addressed insulation removal, radiography, borescope inspection. Inspection results were interpreted to assess degree of contamination and risk of operation.